Next > Last >>
Viewing 1 to 5 of 13 projects
Construction of a 180" x 90" silage pit with 14" walls including middle wall and building over top.
Rocked out site, constructed base for building, erected building and cladding, installed ptrecast wall panel andconstructed floor.
A cubicle building at Auchlane Farm
This is a new 20/40 Herring Bone Parlour with collecting yard.
A new cubicle building built in the Gatehouse area.